RAMBLER SOLAR

  • Year2019

  • LocationTom Green County, TX

The Rambler Solar project, constructed on over 1700 acres near San Angelo, Texas provides enough energy to power the equivalent of 40,000 homes with a 200 MWac capacity.

Clark Bros Inc provided the complete civil works for the project including construction surveying and staking; drainage, erosion and sediment control measures, Stormwater Pollution Prevention Plan (“SWPPP”) requirements, site mowing, site vegetation clearing and grubbing; cut/fill, excavation and grading throughout; site entrances and turnarounds; laydown, storage and parking areas; improvements or installation of all access roads and site roads; asphalt and concrete roadways inverter skid gravel aprons; and all site finishes, including restoration and re-vegetation.